Exam 74-409 – Server Virtualization with Windows Server Hyper-V and System Center (Post 2)

Configure and Manage Virtual Machine High Availability (15-20%)

  • Configure failover clustering with Hyper-V.
    • This objective may include but is not limited to: Configure shared storage; configure Quorum; configure cluster networking; restore single node or cluster configuration; implement Cluster Aware Updating; upgrade a cluster; configure and optimize clustered shared volumes; and configure clusters without network names
  • Manage failover clustering roles.
    • This objective may include but is not limited to: Configure role-specific settings including continuously available shares; configure VM monitoring; configure failover and preference settings; and configure guest clustering
  • Manage virtual machine movement.
    • This objective may include but is not limited to: Perform Live Migration; perform quick migration; perform storage migration; import, export, and copy VMs; configure Virtual Machine network health protection; configure drain on shutdown; manage Physical-to-Virtual (P2V) and Virtual-to-Virtual (V2V) migrations; and implement virtual machine migration between clouds

Implement a Server Virtualization Infrastructure (35-40%)

  • Implement virtualization hosts.
    • This objective may include but is not limited to: implement delegation of virtualization environment (hosts, services, and virtual machines) including self-service capabilities; implement multi-host libraries including equivalent objects; implement host resource optimization; integrate third-party virtualization platforms; and deploying Hyper-V hosts to bare metal
  • Implement virtual machines.
    • This objective may include but is not limited to: Implement highly available VMs; implement guest resource optimization including shared VHDx; configure placement rules; create a Virtual Machine Manager template
  • Implement virtualization networking.
    • This objective may include but is not limited to: Configure Virtual Machine Manager logical networks including virtual switch extensions and logical switches; configure IP address and MAC address settings across multiple Hyper-V hosts including network virtualization; configure virtual network optimization; plan and implement Windows Server Gateway; implement VLANs and pVLANs; plan and implement virtual machine networks; and implement converged networks
  • Implement virtualization storage.
    • This objective may include but is not limited to: Configure Hyper-V host clustered storage; configure Hyper-V virtual machine storage including virtual Fibre Channel, Internet SCSI (iSCSI), and shared VHDx; plan for storage optimization; and plan and implement storage by using SMB 3.0 file shares
  • Manage and maintain a server virtualization infrastructure.
    • This objective may include but is not limited to: Manage dynamic optimization and resource optimization; integrate Operations Manager with System Center Virtual Machine Manager and System Center Service Manager; update virtual machine images in libraries; implement backup and recovery of a virtualization infrastructure by using System Center Data Protection Manager (DPM)

Monitor and Maintain a Server Virtualization Infrastructure (15-20%)

  • Plan and implement a monitoring strategy.
    • This objective may include but is not limited to: planning considerations including monitoring servers using Audit Collection Services (ACS) and System Center Global Service Monitor, performance monitoring, application monitoring, centralized monitoring, and centralized reporting; implement and optimize System Center 2012 Operations Manager management packs; and plan for monitoring Active Directory
  • Plan and implement a business continuity and disaster recovery solution.
    • This objective may include but is not limited to: plan a backup and recovery strategy; planning considerations including Active Directory domain and forest recovery, Hyper-V replica including using Windows Azure Hyper-V Recovery Manager, domain controller restore and cloning, and Active Directory object and container restore using authoritative restore and Recycle Bin; and plan for and implement backup and recovery by using System Center Data Protection Manager (DPM)
Advertisements

4 responses to “Exam 74-409 – Server Virtualization with Windows Server Hyper-V and System Center (Post 2)

  1. Pingback: Exam 74-409 – Server Virtualization with Windows Server Hyper-V and System Center (Post 1) | Life with Computers·

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s